From concept
to energisation.
Read how Moreco identifies, progresses, and delivers EV charging infrastructure — from planning challenge to operational hub.
Case studies
Cross Hands
From Concept to Charge
Moreco progressed the Ultra-Rapid Scheme in Cross Hands in just 12 months from site identification to energisation — working closely with their selected contractor to secure planning, undertake the electrical design and deliver a 10-bay Charging Hub for E.on Drive Infrastructure.
Peterborough
Precision in Planning
At Boulevard Retail Park in Peterborough, Moreco is bringing forward an ultra-rapid EV charging hub designed to integrate seamlessly within its surroundings — protecting existing ecology and mature landscaping while delivering modern EV infrastructure.
Dudley
Behind the Build
How Moreco identified, developed, and delivered a live ultra-rapid EV charging hub at Coseley, Dudley — adjacent to an established BP petrol station, car wash, and large public car park, now open and operational in a dense West Midlands residential catchment.
Bodelwyddan
High-capacity hub on the A55
Full narrative coming soon. A 14-bay ultra-rapid hub in Denbighshire with ~1.5 MW grid capacity secured via SP Energy Networks — among the largest formats in Moreco's pipeline.